Tuesday / 2 Aug 2022

First USA Mission to Lunar Far Side May Be Conducted via CLPS Program in 2025

Draper Laboratory to carry 3 NASA instruments to Schrödinger basin (75.0°S, 132.4°E) on lunar far side NET 2025 under 8th CLPS task order / US$73M contract; 2 Blue Canyon cislunar relay satellites to be deployed prior to landing and operated by Advanced Space; Draper team includes ispace, General Atomics, Systima Technologies; First USA mission to target lunar far side would mark 2nd nation to explore hemisphere after China; Anchor payloads include Lunar Surface ElectroMagnetics Experiment (LuSEE), Lunar Interior Temperature and Materials Suite (LITMS), Farside Seismic Suite (FSS)

Credits: NASA, Draper Labs

Weekend Edition
Fri-Mon / 29 July – 1 Aug 2022

Summer Around Moon Continues with Korea Pathfinder Lunar Orbiter Launching 4 Aug

NASA Capstone performing nominally on voyage to Moon with trajectory correction maneuver 3 expected to be performed by Advanced Space in early September, reach NRHO NET 13 Nov; KPLO Danuri targeting 4 Aug launch on SpaceX F9 from KSC; NASA Artemis 1 prepping for 29 Aug launch to DRO; Autumn landers include ispace Hakuto-R carrying UAE Rashid rover on track for Nov launch to Lacus Somniorum (37.56°N, 30.8°E) with US$37M cash infusion from consortium of Japan banks; Astrobotic Peregrine and Intuitive Machines Nova-C CLPS landers racing to land on Moon before EOY

Credits: NASA, KARI, IM, Astrobotic, Lockheed Martin

Weekend Edition
Fri-Mon / 22-25 July 2022

International Teams Prepare for Summer Around the Moon, Autumn on Lunar Surface

KARI KPLO / Danuri launching on SpaceX F9 to Moon orbit 2 Aug from KSC, arrival at 100-km lunar orbit expected 1 Jan 2023; NASA mega rocket SLS / Orion crew capsule Artemis 1 mission targeting 29 Aug, 2 Sep or 5 Sep for launch to 100-km Moon flyby / 61,155-km Distant Retrograde Orbit; ispace Hakuto-R Mission 1 aiming for November launch, Astrobotic striving to launch Peregrine lander within Q4, Intuitive Machines Nova-C may launch Dec 2022 or Jan 2023; Roscosmos Luna-25 and ISRO Chandrayaan-3 likely delayed to 2023

Credits: KARI, NASA, ispace

Friday / 22 July 2022

ispace Conducting Final Testing on HAKUTO-R Flight Model for November Launch Window

Operating in Japan, USA and Luxembourg, ispace may reach Moon surface within 2022 with Hakuto-R undergoing final thermal vacuum, vibration and function checks at IABG Space Centre near Munich Germany; Flight-ready Mission 1 lander expected to ship to KSC in Sep, launch via SpaceX F9 NET Nov carrying UAE MBRSC and JAXA rovers, flight computer and cameras from Canada enterprises Mission Control Space Services and Canadensys, NGK solid-state battery, engraved panels with supporter names

Credits: ispace

Tuesday / 5 July 2022

CAPSTONE Begins 4-Month Ballistic Lunar Transfer to Unique Moon Orbit

US$32.7M Capstone now being controlled from Advanced Space HQ in Colorado as it navigates 1,300,000km from Earth, utilizing Sun gravity and 8-thruster propulsion system (built by Stellar Exploration) before reaching Near Rectilinear Halo Orbit with apolune 70,000km from MSP, perilune 1,600km from MNP; Rocket Lab CEO Peter Beck heralds “perfect Moon mission success” following 28 June launch to LEO on Rocket Lab Electron / 7 raising maneuvers via Lunar Photon interplanetary stage, culminating in translunar injection from 70,000km above Iberian Peninsula

Credits: Rocket Lab, Advanced Space, NASA

Friday / 3 June 2022

Businesses Develop Moon Infrastructure Technology with Canadian Space Agency Support

CSA-ASC funding 5 companies to advance Lunar Surface Exploration Initiative with 7 studies (~US$200K/ea, $1.4M total) on agricultural science, avionics/comms, mining/ISRU, power; Canadensys (Bolton ON) to study lunar greenhouse, modular rover concepts; MDA (Brampton ON) to study nuclear power generation, autonomous robots / rovers; MPB Communications (Pointe-Claire QC) to study Earth-Moon optical comms, Canadian Space Mining Corporation (Toronto ON) to study lunar prospecting; Honeywell Ltd. of Canada (Ottawa ON) to study Moon surface / orbit communication network

Credits: CSA-ASC, Canadensys, MDA, MPB Communications, Honeywell, Canadian Space Mining Corporation

Weekend Edition
Fri-Mon / 11-14 Feb 2022

Wayward Falcon 9 Likely 1st USA Object to Impact Moon Since LADEE as Starship Prepping to Fly NET March  /// Corrected 14 Feb

Upper stage that inserted NOAA DSCOVR to Sun-Earth L1 in 2015 likely striking near Sea of Tranquility (5.18°N, 233.55°E) on Moon far side 4 March at 12:25:58 UTC, marking 1st USA impactor since 2014; Space archeologists and Moon heritage conservationists eager to study latest artificial object on Moon while cautious of debris considerations; Elon Musk says Starship prototype (Booster 4 / Ship 20) may be ready to orbit NET March pending FAA clearance from Starbase TX; CAPSTONE slated for 19 March, Artemis 1 / SLS NET April followed by Intuitive Machines, Astrobotic, Luna-25, Chandrayaan-3, KPLO, ispace; SLIM and IM-2 also possible in 2022

Credits: SpaceX, NASA

Weekend Edition
Fri-Mon / 29 Oct – 1 Nov 2021

Artemis Era Robotic / Human Moon Vehicles Being Designed and Manufactured Internationally

NASA to construct its first autonomous Moon rover, VIPER, at JSC late 2022, with landing near Nobile Crater NET late 2023; VIPER weighs 450kg with 0.75 kp/h top speed at total cost of US$433.5M; <$500K Carnegie Mellon University 2kg micro-rover Iris, is launch ready; $37.6M Australia rover launching NET 2026; Custom fabricator Hookie of Germany / Russia designer Andrew Fabishevskiy will display Tardigrade concept Moon motorcycle at ADV: Overland in LA; Japan and USA industry including Toyota / General Motors in planning stages of pressurized and unpressurized crewed vehicles

Credits: Hookie, IAC, NASA, CMU, Toyota, Lockheed Martin

Tuesday / 26 October 2021

SpaceX and Boeing Race to Construct Moonships to Achieve Artemis Moon Return

Space Launch System, fully stacked with Orion spacecraft in Block 1 configuration stands 98 m tall / 8.4 m diameter at KSC FL; to undergo interface, stage systems, communications, countdown sequencing, wet dress testing prior to Artemis I inaugural uncrewed Moon flyby, launch window opening 12 Feb 2022; SN20 prototype at Starbase TX is 120 m high / 9 m diameter stacked; Elon Musk claims orbital test ending near Kaua’i HI NET November, with utilization of Mechazilla “robot chopsticks” affixed to launch tower to catch Super Heavy first stage

Credits: Boeing, SpaceX

Weekend Edition
Fri-Mon / 22-25 Oct 2021

‘Superhighway’ in Cislunar Space Vital to Peaceful 21st Century Space Exploration / Logistics

Cislunar space is subject of USA commercial and government attention with US$697,000 SBIR phase 2 award to Rhea Space Activity funding development of cislunar tracking system as plans are made for refueling / resupply depots at Earth-Moon Lagrange points; Access to key trajectories / areas in and around Moon will be competitive, highlighting need for 1959 Antarctica Treaty-style diplomacy guaranteeing Apollo ‘In Peace for All’ ethos in keeping with spirit of 1967 Outer Space Treaty, foundation of modern Artemis Accords

Credits: NASA, BAS