Tuesday / 16 Aug 2022

CAPSTONE Team Celebrates 2022 Mission of the Year Award for Cislunar Orbital Pathfinder

AIAA Small Spacecraft Technical Committee honors Capstone at 36th SmallSat Conference in Utah; Partners on the <US$30M mission include Advanced Space / PI Bradley Cheetham, providing overall project management, Cislunar Autonomous Positioning System (set to interface with LRO) and Ballistic Lunar Transfer / Near Rectilinear Halo Orbit trajectories; Tyvak Nano-Satellite Systems (founded by Jordi Puig-Suari of Cal Poly, co-inventor of the CubeSat standard) and parent company Terran Orbital, who designed, built and operate 25kg, 12U Capstone; Stellar Exploration, manufacturer of hydrazine propulsion system; Launch provider Rocket Lab

Credits: AIAA SmSTC, 2022 SmallSat Conference, Advanced Space, Terran Orbital, Rocket Lab, Stellar exploration

Weekend Edition
Fri-Mon / 5-8 Aug 2022

Danuri and Capstone on Course Towards Lunar Orbit as Artemis 1 and Landers Prepare to Follow

Summer around Moon well underway with KARI KPLO Danuri joining NASA Capstone (operated by Advanced Space) on fuel efficient ballistic lunar transfer trajectory; Danuri expected to reach Moon orbit by 16 Dec, Capstone to arrive 13 Nov; NASA Artemis 1 (SLS megarocket + Orion crew capsule) to take direct 4-day trans-lunar injection route, rollout to KSC pad 39B anticipated 19 Aug, nominal launch date set for 29 Aug; ispace Hakuto-R targets launch to Lacus Somniorum ‘Lake of Dreams’ in Nov; Astrobotic Peregrine working towards Q4 launch to Lacus Mortis ‘Lake of Death’

Pictured: KARI Director Lee Sang-ryool, Advanced Space Capstone Program Manager Tom Gardner; Credits: KARI, Advanced Space, APRSAF

 

Friday / 5 Aug 2022

Astronomy from the Moon Presented at 31st IAU General Assembly in Busan, S. Korea

International Lunar Observatory Association (ILOA) to speak on the resumption of astrophysical investigation from the surface of Moon during Division A (Fundamental Astronomy) talk at 14:40 KST, just hours after Korea Pathfinder Lunar Orbiter Danuri set to launch at 8:08 KST; IM-1 carrying ILO-X to Moon NET Jan 2023 along with co-payload Radio Wave Observations at the Lunar Surface of the photoElectron Sheath (ROLSES); Future AFTM includes ILO-1 (NET 2024), LuSEE (2025), DAPPER, FARSIDE, Lunar Crater Radio Telescope

Credits: IAU, ILOA, NASA

Tuesday / 2 Aug 2022

First USA Mission to Lunar Far Side May Be Conducted via CLPS Program in 2025

Draper Laboratory to carry 3 NASA instruments to Schrödinger basin (75.0°S, 132.4°E) on lunar far side NET 2025 under 8th CLPS task order / US$73M contract; 2 Blue Canyon cislunar relay satellites to be deployed prior to landing and operated by Advanced Space; Draper team includes ispace, General Atomics, Systima Technologies; First USA mission to target lunar far side would mark 2nd nation to explore hemisphere after China; Anchor payloads include Lunar Surface ElectroMagnetics Experiment (LuSEE), Lunar Interior Temperature and Materials Suite (LITMS), Farside Seismic Suite (FSS)

Credits: NASA, Draper Labs

Weekend Edition
Fri-Mon / 29 July – 1 Aug 2022

Summer Around Moon Continues with Korea Pathfinder Lunar Orbiter Launching 4 Aug

NASA Capstone performing nominally on voyage to Moon with trajectory correction maneuver 3 expected to be performed by Advanced Space in early September, reach NRHO NET 13 Nov; KPLO Danuri targeting 4 Aug launch on SpaceX F9 from KSC; NASA Artemis 1 prepping for 29 Aug launch to DRO; Autumn landers include ispace Hakuto-R carrying UAE Rashid rover on track for Nov launch to Lacus Somniorum (37.56°N, 30.8°E) with US$37M cash infusion from consortium of Japan banks; Astrobotic Peregrine and Intuitive Machines Nova-C CLPS landers racing to land on Moon before EOY

Credits: NASA, KARI, IM, Astrobotic, Lockheed Martin

Weekend Edition
Fri-Mon / 22-25 July 2022

International Teams Prepare for Summer Around the Moon, Autumn on Lunar Surface

KARI KPLO / Danuri launching on SpaceX F9 to Moon orbit 2 Aug from KSC, arrival at 100-km lunar orbit expected 1 Jan 2023; NASA mega rocket SLS / Orion crew capsule Artemis 1 mission targeting 29 Aug, 2 Sep or 5 Sep for launch to 100-km Moon flyby / 61,155-km Distant Retrograde Orbit; ispace Hakuto-R Mission 1 aiming for November launch, Astrobotic striving to launch Peregrine lander within Q4, Intuitive Machines Nova-C may launch Dec 2022 or Jan 2023; Roscosmos Luna-25 and ISRO Chandrayaan-3 likely delayed to 2023

Credits: KARI, NASA, ispace

Friday / 22 July 2022

ispace Conducting Final Testing on HAKUTO-R Flight Model for November Launch Window

Operating in Japan, USA and Luxembourg, ispace may reach Moon surface within 2022 with Hakuto-R undergoing final thermal vacuum, vibration and function checks at IABG Space Centre near Munich Germany; Flight-ready Mission 1 lander expected to ship to KSC in Sep, launch via SpaceX F9 NET Nov carrying UAE MBRSC and JAXA rovers, flight computer and cameras from Canada enterprises Mission Control Space Services and Canadensys, NGK solid-state battery, engraved panels with supporter names

Credits: ispace

Tuesday / 5 July 2022

CAPSTONE Begins 4-Month Ballistic Lunar Transfer to Unique Moon Orbit

US$32.7M Capstone now being controlled from Advanced Space HQ in Colorado as it navigates 1,300,000km from Earth, utilizing Sun gravity and 8-thruster propulsion system (built by Stellar Exploration) before reaching Near Rectilinear Halo Orbit with apolune 70,000km from MSP, perilune 1,600km from MNP; Rocket Lab CEO Peter Beck heralds “perfect Moon mission success” following 28 June launch to LEO on Rocket Lab Electron / 7 raising maneuvers via Lunar Photon interplanetary stage, culminating in translunar injection from 70,000km above Iberian Peninsula

Credits: Rocket Lab, Advanced Space, NASA

Friday / 3 June 2022

Businesses Develop Moon Infrastructure Technology with Canadian Space Agency Support

CSA-ASC funding 5 companies to advance Lunar Surface Exploration Initiative with 7 studies (~US$200K/ea, $1.4M total) on agricultural science, avionics/comms, mining/ISRU, power; Canadensys (Bolton ON) to study lunar greenhouse, modular rover concepts; MDA (Brampton ON) to study nuclear power generation, autonomous robots / rovers; MPB Communications (Pointe-Claire QC) to study Earth-Moon optical comms, Canadian Space Mining Corporation (Toronto ON) to study lunar prospecting; Honeywell Ltd. of Canada (Ottawa ON) to study Moon surface / orbit communication network

Credits: CSA-ASC, Canadensys, MDA, MPB Communications, Honeywell, Canadian Space Mining Corporation

Weekend Edition
Fri-Mon / 11-14 Feb 2022

Wayward Falcon 9 Likely 1st USA Object to Impact Moon Since LADEE as Starship Prepping to Fly NET March  /// Corrected 14 Feb

Upper stage that inserted NOAA DSCOVR to Sun-Earth L1 in 2015 likely striking near Sea of Tranquility (5.18°N, 233.55°E) on Moon far side 4 March at 12:25:58 UTC, marking 1st USA impactor since 2014; Space archeologists and Moon heritage conservationists eager to study latest artificial object on Moon while cautious of debris considerations; Elon Musk says Starship prototype (Booster 4 / Ship 20) may be ready to orbit NET March pending FAA clearance from Starbase TX; CAPSTONE slated for 19 March, Artemis 1 / SLS NET April followed by Intuitive Machines, Astrobotic, Luna-25, Chandrayaan-3, KPLO, ispace; SLIM and IM-2 also possible in 2022

Credits: SpaceX, NASA