Tuesday / 7 Feb 2023

Artemis 2 ‘Mega Moon Rocket’ Construction on Track for 2024 Crewed Mission as SpaceX Starship Preps for Orbital Test

Build of next NASA Moonship advances with Artemis 2 SLS core stage nearing completion / integration with 4 Aerojet Rocketdyne RS-25 engines at Michoud Assembly Facility; Sets of SRBs for Artemis 2 & 3 await vehicle readiness at Utah Northrop Grumman plant; Interim Cryogenic Propulsion Stage (ICPS) in final assembly at Florida ULA factory; Orion European Service Module build progressing at KSC Neil Armstrong Building with acoustic tests slated for spring; Orbital test of Starship, the SpaceX vehicle planned to land Astronauts on the Moon (NLT 4 July 2026) may launch orbital test in March if imminent static fire of 33-Raptor engine Super Heavy prototype is successful

Credits: NASA, SpaceX

Friday / 3 Feb 2023

India and USA Advance Cooperation on Commercial Lunar Payload Services (CLPS), Human Spaceflight, Space Science

Several areas of space collaboration between nations to be nurtured following first meeting of U.S.-India initiative on Critical and Emerging Technology (iCET) in Washington DC: CLPS providers to meet with India commercial space companies to identify partnership opportunities; Astronaut exchange will see an ISRO astronaut undergoing training at JSC; Purview of Professional Engineer & Scientist Exchange Program to include space science; U.S. Commerce and India Space departments to lead commercial working group; iCET to solidify details at next meeting in New Delhi within 2023

Pictured: USA National Security Advisor Jacob Sullivan, India National Security Advisor Ajit Doval, Ambassador to the US Taranjit Singh Sandhu, Scientific Advisor to the Prime Minister Ajay Kumar Sood, ISRO Chairman S Somanath; Credits: @IndianEmbassyUS via Twitter

Friday / 27 Jan 2023

13 Proposed Artemis III Landing Sites to be Scrutinized at Virtual Lunar Surface Science Workshop (LSSW)

With institutional support from LPI, USRA, NASA / convened by Samuel Lawrence (JSC) and Noah Petro (GSFC), LSSW The First Steps in a Bold New Era of Human Discovery: Candidate Artemis III Landing Sites will be held online 4-5 April; Locations under consideration are within Artemis Polar Exploration Zone (poleward of 84° S); Artemis 3 to conduct sample collection over ~6 days of surface operations, ≤4 EVAs within 2 km of SpaceX Starship lander; Abstacts due 1 March and will be available for review 21 March

Credits: NASA, LPI

Friday / 20 Jan 2023

Happy 93rd Birthday to Buzz Aldrin as Artemis Generation on Cusp of Resuming Human Activity on Moon 

In a recent op-ed tribute to Apollo 7 Astronaut Walt Cunningham, second person to reach lunar surface Buzz Aldrin reiterates “Human exploration is essential. We must return to the Moon, and then go farther”; The first woman will walk on Moon with Artemis 3 (landing NLT 4 July 2026), a historic event which may be advanced at upcoming State of the Union address 7 Feb; Where crew will land within South Pole area TBD, sites under consideration will be discussed at NASA-sponsored Lunar Science Surface Workshop 4-5 April

Credits: NASA, Twitter / @TheRealBuzz

Friday / 13 Jan 2022

ShadowCam Mapping of Perennially Dark Regions on Moon Begins with Shackleton Crater

2,040-m wide area of the interior of Shackleton Crater (89.9°S, 0.0°E) is first light for ShadowCam instrument on Korea Pathfinder Lunar Orbiter Danuri; Based on Lunar Reconnaissance Orbiter Camera Narrow Angle Camera with 200x light-gathering ability (equivalent to an increase from ISO 100 to 12,800), ShadowCam is a product of San Diego-based company Malin Space Science Systems operated by Arizona State University for NASA; 1.7 m/pixel resolution images to aid in water ice prospecting, landing site analysis for Artemis 3 human landings NET 2025 and KARI indigenous lander mission NET 2032

Credits: KARI, NASA

Friday / 6 Jan 2022

Korea Pathfinder Lunar Orbiter Danuri Sending Awesome Earthrise Images Home While Preparing for Science Operations

From a 100-km circular polar orbit around the Moon, Danuri has an excellent vantage of Earth rising over the lunarscape which KARI team is observing with Lunar Terrain Imager (LUTI), 1 of 6 science payloads to be used for 1-year nominal science mission commencing February; KMAG (KPLO Magnetometer), Wide-Angle Polarimetric Camera (PolCam), KPLO Gamma-Ray Spectrometer (KGRS), Disruption Tolerant Network Experiment Payload (DTNPL) also developed by KARI; ShadowCam built by ASU for NASA, based on Narrow Angle Camera components of LROC on LRO with 200x sensitivity

Credits: KARI

New Year Holiday Edition
Fri-Mon / 23 Dec 2022 – 2 Jan 2023

2023 Moon Roster Full of Independent and National Touchdowns Following 2022 Orbital Activity

At least 6 attempts to robotically land on the lunar surface are slated for 2023, after a year that saw Capstone DRHO insertion, Danuri near 100 x 100 km desired polar orbit (refining current 109 x 8920 km via 4 additional orbital maneuvers), Artemis 1 flyby / DRO; Hakuto launched on Dec 11 as Orion splashed down, now on 1-month cruise to next TCM targeting April landing; Landers Nova-C and Peregrine launching NET Q1, SLIM April, Chandrayaan-3 June, Luna-25 July, while Chang’E-3 lander / LUT, Chang’E-4 Yutu-2 rover continue only current operations on Moon

Credits: NASA, ispace, IM, Astrobotic, ISRO

Weekend Edition
Fri-Mon / 9-12 Dec 2022

Orion Return is Beginning of New Era of Lunar Exploration as 2023 Commercial and National Moon Mission Prepare

Mission team including Landing / Recovery Director Melissa Jones, Entry Flight Director Judd Frieling now planning to recover Orion capsule near Guadalupe Island, ~241 km from Baja California coast following 11 Dec 09:40 PST splashdown; Just 10 hours prior, ispace HAKUTO-R lander is to launch to Moon from CCSFS (02:38 EST); CLPS missions from Intuitive Machines and Astrobotic to follow NET Q1 2023, JAXA SLIM NET April, ISRO Chandrayaan-3 NET June; Artemis 2 circumlunar crewed mission NET May 2024, SpaceX uncrewed demo mission and crewed dearMoon NET 2024

Credits: Astrobotic, Blue Origin, NASA

Friday / 9 Dec 2022

Peregrine Testing Advances, Astrobotic Joins Blue Origin-led Sustaining Lunar Development Team

Astrobotic Peregrine 120-kg payload class (35 kg dedicated commercial) lunar lander currently undergoing electromagnetic compatibility / interference testing at 32-acre Dayton T. Brown lab with thermal vacuum testing to follow; Aerotech Inc to integrate Peregrine into payload fairing of ULA Vulcan Centaur at CCSFS; PM1 reportedly launching first half of 2023 to either Lacus Mortis (45.13°N, 27.32°E) or Gruithuisen Domes (36.56°N, 40.72°W); Astrobotic now member of ‘National Team’ vying for NASA SLD human / cargo lander (uncrewed demo NET 2026) contract with Blue Origin, Draper, Honeybee, Boeing, Lockheed Martin

Credits: Astrobotic, Blue Origin, NASA

Weekend Edition
Fri-Mon / 2-5 Dec 2022

Wave of Independent Moon Missions to Trail Artemis 1, Followed by National Efforts, Then Another Raft of Indies

As NASA / ESA Orion Moonship returns to Earth, Advanced Space-controlled, Tyvak-built, NASA-funded Capstone remains in NRHO and Korea Pathfinder Lunar Orbiter Danuri on course to reach Moon orbit 16 Dec, planned commercial missions include ispace M1 awaiting SpaceX launch at KSC pending F9 review; Intuitive Machines IM-1 March 2023; Astrobotic PM1 Q1 2023; Followed by national missions from JAXA (SLIM, April 2023), ISRO (Chandrayaan-3, June 2023), Roscosmos (Luna-25, July 2023); Independents IM-2 (late 2023), SpaceX landing demo mission (2024), IM-3 (Q2 2024), Astrobotic GM1 (Nov 2024)

 Credits: NASA, ISRO, KARI, IM, SpaceX, Astrobotic,