Weekend Edition
Fri-Mon / 10-13 March 2023

Artemis Moon Exploration Advances with Increased Funding Proposal, Upcoming Crew and Spacesuits Reveal

Biden-Harris Administration fiscal year 2024 USA budget allocates US$27.2B for NASA, a 7.1% increase, with $8.1B for lunar exploration & $949M for Mars sample return; Artemis II 4-member crew to be announced at joint NASA / CSA-ASC joint press event at JSC Ellington Field 3 April, with astronaut interviews 4 April; Prototype Exploration Extravehicular Mobility Unit (xEMU) space suits for Artemis III lunar surface exploration being developed by Axiom / Raytheon subsidiary Collins Aerospace under $3.5B contract running through 2034 to be demonstrated 15 March at Space Center Houston

Credits: NASA

Friday / 10 March 2023

Farside Radio Astronomy to be Pioneered by LuSEE-Night CLPS Mission NET Late 2025

Landing near northern rim of Nassau crater on lunar farside (23.81°S, 176.83°E) on TBD commercial lander, Lunar Surface Electromagnetics Experiment-Night (LuSEE-Night) led by PI Stuart Bale (UC-Berkeley), co-investigator Jack Burns (CU Boulder) and DOE / Brookhaven National Lab is slated to be the first radio astronomy precursor to test low frequency detection limits (<50 MHz) in the pursuit of cosmological dark ages (380,000 years post-Big Bang) observation via 21-cm neutral hydrogen emissions; LuSEE-Night is to operate throughout lunar night / day cycle for up to 2 years thanks to 40-kg battery system

Pictured: PI Stuart Bale; Paul O’Connor, Anže Slosar, Sven Herrmann of Brookhaven Lab; Credits: DOE, NASA, UC-Berkeley, LinkedIn

Tuesday / 7 March 2023

Dynetics Touts Human Landing System Technology Advances Ahead of June HLS SLD Selection

Under NASA NextSTEP-2 Appendix N US$45M award, Leidos subsidiary Dynetics has matured key equipment it hopes will strengthen its bid with partner Northrop Grumman for Appendix P: Human Landing System Sustaining Lunar Development & Demonstration contract / uncrewed & crewed demo missions around Artemis 5 or later (NET 2028); Tech validations include methalox main / RCS propulsion testing at MSFC, Cryogenic Fluid transfer demonstration at GRC, Electrodynamic Dust Shield modules (first created at KSC); Blue Origin-led team including Draper, Lockheed Martin, Boeing, Astrobotic, Honeybee Robotics also competing for Appendix P contract

Pictured: Dynetics HLS Manager Andy Crocker; Credits: Dynetics, NASA

Friday / 17 Feb 2023

Mountain at Moon South Pole Named in Honor of NASA Apollo-era Mathematician Melba Roy Mouton

The 6,096-m high mountain on the western rim of Nobile Crater (~85.4°S, 37.5°E) is now officially known as Mons Mouton after NASA Volatiles Investigating Polar Exploration Rover (VIPER) team nomination to IAU Working Group for Planetary System Nomenclature; Situated just a few km east of Leibnitz Beta Plateau, Mons Mouton is to be the site of the 100-day VIPER mission to be delivered via Astrobotic Griffin lander NET Nov 2024; Mons Mouton is also 1 of 13 sites selected by NASA fo Artemis 3 human landings NET 2025

Pictured: Melba Roy Mouton, WGPSN Organizing Committee members Rita Schulz, Debra Elmegreen, José Espinosa; Credits: IAU, NASA

Friday / 10 Feb 2023

Capstone Lunar Orbit Pathfinder Team Attempting to Establish 2-Way Communication / Navigation Link with LRO

Led by Advanced Space, Capstone mission on 13th orbit of Moon, will soon exceed 3 months in 1,500 x 75,000-km near-rectilinear halo orbit (NRHO), the intended path of Lunar Gateway human waystation (launching NET Nov 2024); The Terran Orbital-built 6U CubeSat has ~56% fuel (120 m/s ΔV) remaining, on track to surpass 6-month goal in orbit following 11-day command loss / recovery; Team working to validate spacecraft-to-spacecraft navigation tech demonstration Cislunar Autonomous Positioning System with LRO, and attempt stand-alone navigation with Chip Scale Atomic Clock measurement of DSN radio signal

Pictured: Advanced Space CEO Bradley Cheetham; Credits: Advanced Space, NASA, Terran Orbital

Tuesday / 7 Feb 2023

Artemis 2 ‘Mega Moon Rocket’ Construction on Track for 2024 Crewed Mission as SpaceX Starship Preps for Orbital Test

Build of next NASA Moonship advances with Artemis 2 SLS core stage nearing completion / integration with 4 Aerojet Rocketdyne RS-25 engines at Michoud Assembly Facility; Sets of SRBs for Artemis 2 & 3 await vehicle readiness at Utah Northrop Grumman plant; Interim Cryogenic Propulsion Stage (ICPS) in final assembly at Florida ULA factory; Orion European Service Module build progressing at KSC Neil Armstrong Building with acoustic tests slated for spring; Orbital test of Starship, the SpaceX vehicle planned to land Astronauts on the Moon (NLT 4 July 2026) may launch orbital test in March if imminent static fire of 33-Raptor engine Super Heavy prototype is successful

Credits: NASA, SpaceX

Friday / 3 Feb 2023

India and USA Advance Cooperation on Commercial Lunar Payload Services (CLPS), Human Spaceflight, Space Science

Several areas of space collaboration between nations to be nurtured following first meeting of U.S.-India initiative on Critical and Emerging Technology (iCET) in Washington DC: CLPS providers to meet with India commercial space companies to identify partnership opportunities; Astronaut exchange will see an ISRO astronaut undergoing training at JSC; Purview of Professional Engineer & Scientist Exchange Program to include space science; U.S. Commerce and India Space departments to lead commercial working group; iCET to solidify details at next meeting in New Delhi within 2023

Pictured: USA National Security Advisor Jacob Sullivan, India National Security Advisor Ajit Doval, Ambassador to the US Taranjit Singh Sandhu, Scientific Advisor to the Prime Minister Ajay Kumar Sood, ISRO Chairman S Somanath; Credits: @IndianEmbassyUS via Twitter

Friday / 27 Jan 2023

13 Proposed Artemis III Landing Sites to be Scrutinized at Virtual Lunar Surface Science Workshop (LSSW)

With institutional support from LPI, USRA, NASA / convened by Samuel Lawrence (JSC) and Noah Petro (GSFC), LSSW The First Steps in a Bold New Era of Human Discovery: Candidate Artemis III Landing Sites will be held online 4-5 April; Locations under consideration are within Artemis Polar Exploration Zone (poleward of 84° S); Artemis 3 to conduct sample collection over ~6 days of surface operations, ≤4 EVAs within 2 km of SpaceX Starship lander; Abstacts due 1 March and will be available for review 21 March

Credits: NASA, LPI

Friday / 20 Jan 2023

Happy 93rd Birthday to Buzz Aldrin as Artemis Generation on Cusp of Resuming Human Activity on Moon 

In a recent op-ed tribute to Apollo 7 Astronaut Walt Cunningham, second person to reach lunar surface Buzz Aldrin reiterates “Human exploration is essential. We must return to the Moon, and then go farther”; The first woman will walk on Moon with Artemis 3 (landing NLT 4 July 2026), a historic event which may be advanced at upcoming State of the Union address 7 Feb; Where crew will land within South Pole area TBD, sites under consideration will be discussed at NASA-sponsored Lunar Science Surface Workshop 4-5 April

Credits: NASA, Twitter / @TheRealBuzz

Friday / 13 Jan 2022

ShadowCam Mapping of Perennially Dark Regions on Moon Begins with Shackleton Crater

2,040-m wide area of the interior of Shackleton Crater (89.9°S, 0.0°E) is first light for ShadowCam instrument on Korea Pathfinder Lunar Orbiter Danuri; Based on Lunar Reconnaissance Orbiter Camera Narrow Angle Camera with 200x light-gathering ability (equivalent to an increase from ISO 100 to 12,800), ShadowCam is a product of San Diego-based company Malin Space Science Systems operated by Arizona State University for NASA; 1.7 m/pixel resolution images to aid in water ice prospecting, landing site analysis for Artemis 3 human landings NET 2025 and KARI indigenous lander mission NET 2032

Credits: KARI, NASA