Weekend Edition
Fri-Mon / 17-20 June 2022

CAPSTONE, KPLO Danuri and Artemis 1 Teams Working Towards Summer 2022 Moon Orbit

NASA Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment now striving for 25 June launch from LC-1 on Māhia NZ via Rocket Lab Electron / Photon; KARI lunar orbiter Danuri ‘fully prepared’ for 2 August launch on SpaceX Falcon 9 from KSC – South Korea will be 8th nation with Moon probe; Artemis 1, fully stacked with SLS and Orion, to begin WDR countdown 18 June, NASA mission availability schedule indicates 148 possible launch opportunities from 23 August 2022 – 1 July 2023

Credits: NASA, KARI, Rocket Lab

Weekend Edition
Fri-Mon / 10-13 June 2022

NASA Moon Orbiter Awaiting New Launch Window as CLPS Providers Race to Achieve Moon Landings

While CAPSTONE is fueled and integrated with Photon spacecraft bus within Electron fairing at Rocket Lab Launch Complex 1 on Māhia NZ, new mission schedule is pending per NASA PAO; When launched Capstone to travel 1,549,798km from Earth before settling into NRHO; Astrobotic and Intuitive Machines working to land by EOY; Image of BE-4 flight engine shared by ULA CEO raises hopes for Vulcan Centaur readiness but 2022 integration / launch of Peregrine doubtful; IM welcomes Lunar Flashlight cubesat as co-payload on Falcon 9 launch nominally set for 22 Dec

Credits: NASA, Rocket Lab, Tory Bruno / Twitter

Friday / 10 June 2022

NASA Conducting Extensive Testing of Solar Electric Propulsion (SEP) for Lunar Gateway

Power and Propulsion Element of Lunar Gateway under development by Maxar to utilize 6 and 12kW Hall-effect ion thruster systems built by Busek and Aerojet Rocketdyne with Moog xenon propellant feeder and Maxar power processing unit; Current testing regimen comes after initial testing phase finds both systems ‘capable of performing across the full mission power range’; SEP to keep Gateway on efficient NRHO during 15-year mission after Q4 2024 launch via SpaceX Falcon Heavy; Tiangong space station is only human-rated ion-powered spacecraft

Credits: NASA, Maxar, Aerojet Rocketdyne

Weekend Edition
Fri-Mon / 3-6 June 2022

Summer Around the Moon: 3 Orbiters May Embark as NASA Funds New Private Sector Lunar R&D

NASA CAPSTONE targeting 13-22 June launch window; KARI Danuri set for 2 Aug, NASA Artemis 1 team working to achieve WDR 19 June then NET Aug launch; Vessels are bound for ~1,609×70,006km NRHO, elliptical 100km polar orbit, and 100×61,155km DRO respectively; NASA PRISM science proposals Lunar-VISE (investigation of Gruithuisen Domes), LEIA (study of yeast exposed to lunar environment) to receive CLPS task orders for launch circa 2026; NASA SSTR awarding US$150K to Air Company Holdings / NYU for development of RP-1 production process using only CO2 / H2; NASA Break the Ice Lunar Challenge phase 2 distributing $3M for water harvesting tech

Credits: NASA, KARI

Wednesday / 1 June 2022

Newly Named ‘Danuri’ Korea Pathfinder Lunar Orbiter on Track for 2 Aug Launch to Moon

Selected from 62,719 submissions across South Korea by a 1000-person focus group, Korea Pathfinder Lunar Orbiter, now Danuri (Moon Enjoy), set for launch on 2 Aug (19:37 EDT) to 100-km Moon orbit on SpaceX Falcon 9 via ballistic lunar transfer; 678-kg spacecraft is outfitted with 6 instruments – KARI-built Lunar Terrain Imager, Wide-Angle Polarimetric Camera, Magnetometer, Gamma-Ray Spectrometer, Disruption Tolerant Network Experiment Payload and NASA provided ShadowCam; NASA will also assist Danuri with ground station / comms / navigation support and 9-member KPLO Participating Scientist Program

Credits: KARI, NASA, SpaceX

Weekend Edition
Fri-Tues / 27-31 May 2022

Global Moon Regatta Preparations Advance as 2022/3 Launch Windows Approach

NASA now targeting 6-22 June window for inaugural Artemis-era CAPSTONE launch to validate unique orbit around Moon, holding virtual social launch day event with worldwide interaction via Facebook 6 June; Meanwhile Artemis 1 / SLS rocket begins return to KSC launch pad 39B also 6 June, WDR attempt scheduled 19 June; Roscosmos Luna-25 slated for 22 August sans ESA PILOT-D navigation system; ispace HAKUTO-R, CLPS missions IM-1 / PM1 striving for Q4 launch; ISRO Chandrayaan-3, JAXA SLIM pushed to 2023

Credits: NASA

Weekend Edition
Fri-Mon / 20-23 May 2022

Lunar Exploration / Science Missions Working Toward Orbit, Surface Landings In 2022

NASA CAPSTONE Moon probe launching on Rocket Lab Electron / Photon interplanetary kick stage is set to depart Earth NET 31 May, spending 6 days accelerating to 39,429 kph in LEO for 4-month fuel-sipping journey to test NRHO; Artemis 1 set for August per Administrator Nelson, however launch opportunities extend to 2023; KARI KPLO heading for lunar orbit 1 Aug, will broadcast K-pop; Roscosmos Luna-25 targeting 22 August while CLPS providers Intuitive Machines, Astrobotic and ispace of Japan strive to land on Moon within year

 

Credits: NASA, IM, Astrobotic, Draper, KARI

Weekend Edition
Fri-Mon / 22-25 April 2022

2022 Moon Missions Preview: CAPSTONE Could Lead Way on 3 May

Launch window opening 3 May for CAPSTONE orbiter still on schedule; Artemis-1 SLS / Orion / 10 CubeSat launch now likely July-August; Intuitive Machines Nova-C cradle (built by Caldwell Group) to transport lunar lander to KSC arrives in Houston for testing / launch windows for IM-1 & IM-2 announced ‘soon’; Astrobotic Peregrine flight model to have solar panels, fuel tanks, engines installed – launch late 2022; Luna-25 ‘later this year’; Japan ispace lander end of 2022 via SpaceX, SLIM pushed to March 2023; Korea Pathfinder 1 August Launch; ISRO Somanath puts doubt on Chandrayaan-3 launch in 2022

Credits: Advanced Space / Jason Johnson, IM, Astrobotic, ispace, ISRO

Weekend Edition
Fri-Mon / 25-28 March 2022

2022 Moon Missions Update

9 robotic expeditions to Luna are set to occur before years end: Artemis 1 EGS team performing Engineering Tests ahead of 1 April start of WDR with final countdown sequence 3 April at KSC pad 39B, launching to Moon orbit NET June; 2 additional orbiters from NASA (CAPSTONE) and KARI (KPLO) being prepped for 3-15 May and NET Aug launch time frame, S. Korea also plans lander NET 2030 per President Moon Jae-in statement; National flagship missions from India (Chandrayaan-3, NET Aug), Russia (Luna-25, NET July) and Japan (SLIM, NET Q4) aiming for Moon surface, as are 2 USA commercial missions (Intuitive Machines NET June, Astrobotic NET Nov) and 1 Japan commercial mission (ispace, NET Oct)

 

Credits: NASA, Draper, Astrobotic, Intuitive Machines, Orbit Beyond

Tuesday / 22 March 2022

LRO, Now in 13th Year of Operation, to Image Long March 3C Impact Site on Moon Far Side

First space debris to strike Moon, likely upper stage of LM-3C used to deliver Chang’e-5 T1 to lunar free return trajectory, will “use its cameras to attempt to identify the impact site”; LRO 20x165km eccentric polar selenocentric orbit is calibrated to reach perilune over the Moon South Pole (now pinpointed to “halfway between 10 and 11 o’clock” of an imaginary clock superimposed over Shackleton Crater), requiring “weeks to months” to achieve favorable conditions; Impact may be visible in Release 50C (15 June) or 51A (15 July)

 

Credits: NASA