Friday / 23 Sep 2022

Artemis and Starship: Mega Rockets Intended for Human Moon Exploration Advance Towards Flight

NASA to update on cryogenic tanking test which saw 7% hydrogen leak from 20-cm seal largely mitigated by reducing fueling pressure at 23 Sep press briefing; Next launch opportunity 27 Sep pending weather & flight termination system battery waiver; Starship ‘Ship 24’ and Super Heavy ‘B7’ prototypes to undergo full stack WDR / hot fire testing at SpaceX Starbase in TX, from which possible October or likely November orbital test launch is to occur, with B7 splashing down in Gulf of Mexico and Ship 24 soft landing in Pacific 100-km NW of Kauaʻi

Credits: NASA, SpaceX

Tuesday / 20 Sep 2022

Moon South Pole is Target for Increasing Number of International Robotic and Human Missions 2023-28

CLPS provider Intuitive Machines to redirect IM-1 mission NET Q1 2023 from mid-latitude to MSP at NASA request, IM-2 already slated for Shackleton Connecting Ridge (89.5°S); ISRO Chandrayaan-3 targeting 71°S NET Feb 2023; Roscosmos Luna-25 aiming for 70°S NET 2023; Astrobotic to deliver VIPER rover to 85°S NET Nov 2024; CNSA Chang’E-7 to land near (L-R) Shackleton (90°S), Nobile (85°S) or Haworth (87°S) craters NET 2026; Artemis 3 to target 1 of 13 regions within 6° of MSP via SpaceX HLS; 6.25-day Polar Sortie Mission and 33-day Polar Excursion Mission on 2nd HLS to be awarded May 2023, launch NET 2028

Credits: NASA, IM

Weekend Edition
Fri-Mon / 16-19 Sep 2022

IAC73 Gathers Lunar Exploration Community, Optimal Landing Sites Including 4,990-m Malapert Under Consideration

Engaging 6,500+ world space professionals, International Astronautical Congress 2022 in Paris will be site of numerous high-level discussions during first Moon Exploration session 19 Sep: (L-R) Tatsuaki Hashimoto of JAXA to update on Omotenashi 6U CubeSat / micro-lander, to be deployed by Artemis 1; Daniel Andrews of NASA to share news on VIPER launching NET 2024; Steve Durst of ILOA Hawaii to present 5 Moon Missions September 2022 Update and rally support for prime South Pole landing area with Malapert Mountain: Moon High Ground Point E Awaits Landers interactive presentation

 

Credits: NASA, JAXA, ILOA

Tuesday / 13 Sep 2022

Chang’E Program Moving Forward, Water / Helium-3 Content Confirmed in Returned Samples, Agriculture on TSS

CNSA has state approval for phase 4 of Chang’E lunar program, consisting of CE-6 farside sample return (NET 2024), CE-7 MSP exploration with rover / hopper (NET 2024), and CE-8 ISRU study (NET 2027) after CE-5 1.731-kg lunar samples show ~170 ppm OH/H2O, per CAS Institute of Geochemistry infrared / ion mass spectroscopy analysis; Additional study by Beijing Research Institute of Uranium Geology discovers 10 μm crystal of new mineral Changesite–(Y) and reportedly determines concentration and outlines extraction of 3He; China students participating remotely in thale cress / rice study on Tiangong Space Station under “Growing Plants Together with Astronauts” program

Credits: China National Space Agency, Chinese Academy of Sciences

Weekend Edition
Fri-Mon / 9-12 Sep 2022

2022/3 Moon Missions Approach as Capstone & Danuri Near Lunar Orbit, Artemis Team Working to Launch

NASA Capstone on route to 3,000 x 70,000-km near rectilinear halo orbit 13 Nov; Danuri not far behind on similar low-energy ballistic lunar transfer, to reach orbital insertion 16 Dec; Artemis 1 may launch 23 or 27 Sep if LH2 leak is remedied on launchpad, JAXA 6U Omotenashi semi-hard impactor is 1 of 10 CubeSat rideshares; ispace Nov launch of Hakuto-R / Rashid rover, also to 3-month low-energy trajectory, landing in equatorial Lacus Somniorum; Astrobotic Peregrine lander slated to launch before EOY; Intuitive Machines Nova-C lander striving for NET Jan 2023 launch; ISRO Chandrayaan 3 targeting Q1 2023; Roscosmos Luna-25 pushed to NET 2023; JAXA SLIM slated for NET March 2023

Credits: NASA, KARI, Advanced Space

Friday / 2 Sept 2022

As Danuri Orbiter Approaches L1 Trajectory Correction, KARI Seeks Funding for 2031 Moon Lander

Nearing Lagrange Point 1, ~1.5 million km (0.01 AU) distant from Earth, Korea Aerospace Research Institute preparing to execute Trajectory Correction Maneuver 2 Sept (14:00 KST, 05:00 UTC) to propel 678-kg Danuri spacecraft away from Sun gravity towards Moon per fuel efficient ballistic lunar transfer protocol; Meanwhile KARI, led by (BR) Lee Sang-Ryool, reportedly requesting US$459M (₩618B) from South Korea government to support 1,800-kg Moon lander powered by solar & RTG, carrying 15-kg rover, to launch NET 2031 on next generation Nuri rocket

Credits: KARI, Korea Ministry of Culture

Weekend Edition
Fri-Mon / 19-22 Aug 2022

Artemis Program Getting New Director as Critics Sound Alarm on Need for Organizational Coherency

As directed by congress in NASA Authorization Act of 2022, the agency is to appoint Director of Moon to Mars office, responsible for development of “an integrated master plan, integrated master schedule, and integrated risk management procedures” and reporting to Exploration Systems Development Mission Directorate Administrator (T-B) Jim Free; Executive restructure comes amid stern warnings from prominent space community members to Politico, including NASA Aerospace Safety Advisory Panel Chair Patricia Sanders and AIAA Director Daniel Dumbacher; VP Kamala Harris to discuss “new rules framework” at National Space Council meeting 9 Sep

Credits: NASA

Friday / 19 Aug 2022

NASA to Declare Candidate Regions for Artemis 2025 Human Moon Landing at Press Briefing

Potential landing areas for Artemis 3, with crewmembers including the first woman and first person of color on the Moon, to be revealed at media teleconference with NASA officials (L-R) Mark Kirasich, Jacob Bleacher, Sarah Noble and Prasun Desail; Regions are within 6° of MSP, are of scientific interest and contain viable landing sites; Criteria including communication coverage, illumination, and topographical considerations given weight in decision; NASA to outreach to “broader science community” to make final human landing site selection; Meeting audio to be broadcast Friday 19 Aug at 14:00 EDT

Credits: NASA

Weekend Edition
Fri-Mon / 12-15 Aug 2022

Commercial and National Moon Mission Cadence to Continue Through 2022, Increase in 2023

Artemis 1 launching to Moon orbit NET 29 Aug with 10 rideshare cubesats, NASA test dummy Commander Moonikin Campos, DLR / ISA torso radiation ‘phantoms’ Helga & Zohar, mascots Snoopy & Shaun the Sheep; Race to landings led by ispace, aiming for Nov launch, Astrobotic working to launch NET Dec, seeking to acquire Masten assets with US$4.5M bid; Intuitive Machines striving for Jan 2023 followed by ISRO Chandrayaan-3 NET Q1, JAXA SLIM NET March and Roscosmos Luna-25 NET September; Xplore of Redmond WA and Turkish Space Agency have also declared for uncrewed lunar orbit in 2023, SpaceX plans crewed dearMoon

Credits: Lockheed Martin, NASA, ispace, ESA

Weekend Edition
Fri-Mon / 5-8 Aug 2022

Danuri and Capstone on Course Towards Lunar Orbit as Artemis 1 and Landers Prepare to Follow

Summer around Moon well underway with KARI KPLO Danuri joining NASA Capstone (operated by Advanced Space) on fuel efficient ballistic lunar transfer trajectory; Danuri expected to reach Moon orbit by 16 Dec, Capstone to arrive 13 Nov; NASA Artemis 1 (SLS megarocket + Orion crew capsule) to take direct 4-day trans-lunar injection route, rollout to KSC pad 39B anticipated 19 Aug, nominal launch date set for 29 Aug; ispace Hakuto-R targets launch to Lacus Somniorum ‘Lake of Dreams’ in Nov; Astrobotic Peregrine working towards Q4 launch to Lacus Mortis ‘Lake of Death’

Pictured: KARI Director Lee Sang-ryool, Advanced Space Capstone Program Manager Tom Gardner; Credits: KARI, Advanced Space, APRSAF