Weekend Edition
Fri-Mon / 14-17 July 2023

India Moon Lander Launch Leads Wave of Back-to-Back-to-Back National Missions Headed to Moon

ISRO ~US$75M Chandrayaan-3 on Earth Centric Phase 1 of Moon transit, in which 5 orbital raising maneuvers are set to occur prior to Lunar Transfer Phase 2 and Moon Centric Phase 3-10 with lander & rover landing at MSP region (69.367°S, 32.348°E) NET 23 Aug and Propulsion Module placed in 100-km circular orbit; Roscosmos to launch Luna-25 on 11 Aug at 23:10 UTC with direct TLI route, possibly reaching MSP region landing site (69.545°S, 43.544°E) before Chandrayaan-3; JAXA Smart Lander for Investigating Moon (SLIM) “Moon Sniper” launching with XRISM space telescope 26 Aug at 00:34:57 UTC

Credits: ISRO, JAXA, Roscosmos

Weekend Edition
Fri-Mon / 7-10 July 2023

India Moon Landing Mission Chandrayaan-3 Set for Liftoff

The 3,900-kg Chandrayaan-3 spacecraft (lunar lander, propulsion module, rover) now encapsulated in LVM3 payload fairing as ISRO makes final preparations for 14 July, 02:35 IST launch from Satish Dhawan Space Centre – India citizens invited to register for Launch View Gallery, vantage from southern areas of Sriharikota island / Pulicat Lake also available; Landing in MSP region (69.37°S, 32.35°E) expected 23-24 August; Mission duration is 1 lunar day (~14 Earth days) nominal, however ISRO Chairman S. Somanath is hopeful of 2nd lunar day extended operations if lander / rover survive night and recharge via solar panels

Credits: ISRO, IISc Bangalore

Weekend Edition
Fri-Mon / 30 June – 3 July 2023

USA, China, Canada and India Crewed Moon Missions on Horizon

As 2023 second half begins, NASA seeking ≤ 60 kg lunar surface science payloads under Artemis III Deployed Instruments (A3DI) Program, with Step-1 proposals due 30 June, Step-2 due 31 Aug; CNSA Chang’E-7 team evaluating international payload proposals, expert review due 1 July, final tech confirmation 1 Sep; CMSE working to land Taikonauts via LM-9 / 10 in 2020s, build ILRS with construction starting NET 2026; Astronaut Jeremy Hansen, set to be first Canadian to fly by Moon NET Nov 2024, celebrates Canada Day 1 July; ISRO Chandrayaan-3 launching 13 July at 14:30 IST, human landings may be accelerated via Artemis / USA-India partnership

Credits: NASA, USA, China, Canada, India

Tuesday / 27 June 2023

China Advancing Robotic Lunar Exploration Program, Human Landings in 2020s, Public Outreach

10+ years of continuous operation on surface of Moon set to continue in phase 4 of Chinese Lunar Exploration Program with Queqiao-2 lunar orbital relay launching in early 2024, followed by far side sample return Chang’E-6 launching NET May 2024, landing at ~43.0°S, 154.0°W after 53-day trip; First regolith samples from far side will be analyzed under direction of Lunar Exploration and Space Engineering Center (LESEC); Organizational representatives of DSEL, LESEC, USTC inspire youth with Revealing Moon Mysteries, Exploring the Universe outreach program; International Lunar Research Station Cooperation Organization (ILRSCO) making progress on Moon base consortium; CMSA targeting 2020s crewed lunar mission

Pictured (L-R): Science and Technology Daily Host Gong Qian, LESEC Engineer Zhang Tianli, LESEC International Cooperation Department Project Manager Shen Yuduo, USTC Associate Professor Low Jing Xiang; Credits: CNSA, DSEL, UDN, LESEC, Science and Technology Daily 

Weekend Edition
Fri-Mon / 23-26 June 2023

India Aims for the Moon with Chandrayaan-3 and Artemis / Technology Partnership with USA

Chandrayaan-3 awaiting 8-day launch window opening 12 July at Satish Dhawan Space Centre / landing attempt at 4 x 2.4 km landing area at 69.367621°S, 32.348126°E; Science payloads to be utilized over 1-lunar day mission include Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA) to characterize near surface lunar plasma; India to enhance lunar & space capabilities via Artemis membership and steps outlined in New Technology Partnership for the Future section of document issued by White House, which calls for facilitation of technology transfer and export control reform

Pictured (L-R): U.S. State Dept Deputy Assistant Secretary for India Nancy Jackson, NASA Administrator Bill Nelson, India Ambassador to the United States Taranjit Sandhu, ISRO representative Krunal Joshi; Credits: NASA, ISRO
 

Friday / 23 June 2023

India Joins Artemis as International Lunar Research Station Builds its Coalition for Sustained Moon Activity

India and Equador are the latest signatories to USA-led Artemis Accords, bringing total national membership to 27; ISRO-NASA human spaceflight cooperation plan to be detailed by end of 2023 including ISRO vyomanaut training at JSC, ISRO ISS mission & NISAR launch NET 2024 – partnership “spans the seas to the stars” per joint statement; ILRS reportedly welcoming new partner nations Bangladesh, Iran, Mongolia, Pakistan, Peru, Thailand (of Asia-Pacific Space Cooperation Organization) and UAE (1st nation with dual Artemis / ILRS membership) while talks ongoing with 10+ other countries

Credits: NASA, ISRO, ILRS, CNSA, Roscosmos, Twiiter / @htTweets
 

Weekend Edition
Fri-Mon / 16-19 June 2023

India and Russia Accelerating Quest to Pioneer Moon South Pole

ISRO Chandrayaan-3 lunar lander undergoing final integration with LVM-3 rocket at Satish Dhawan Space Centre and is slated for launch to Moon between 12 and 19 July followed by ~1 month cruise and landing at 69.37°S, 32.35°E with ≤ 2 m / sec final velocity touchdown; Roscosmos Luna-25 (47 years after Luna-24) is to follow NET 11 Aug launching from Vostochny Cosmodrome, with direct TLI route powered by Soyuz-2.1b with Fregat upper stage lasting only a few days until landing at 69.55°S, 43.54°E, just ~120km distant from Chandrayaan-3; Intuitive Machines Nova-C NET Q3, Astrobotic Griffin NET Nov 2024, NASA Artemis 3 NET Dec 2025, Chang’E-7 around 2026 also targeting MSP

Pictured: ISRO Chairman S. Somanath, Roscosmos Director Yury Borisov; Credits: ISRO, Roscosmos, Lavochkin
 

Tuesday / 13 June 2023

NASA Scientists Contend Hospitable Conditions for Life at MSP Ought to be Consideration of Human Moon Landings

Prabal Saxena, Heather Graham, Natalie Curran, Betsy Pugel, Andrew Needham, and Noah Petro of GSFC and Aaron Regberg of JSC (L-R) show areas around Moon South Pole being analyzed for Artemis III and other future human missions are relatively conducive to certain microorganisms (B. subtilis, D. radiodurans) due to surface topography (75% protection from solar UV radiation south of 83.5°S) and temperature (maximum < 323 K) in paper presented at 25 May Artemis III Candidate Landing Regions Workshop; Study co-author Heather Graham tells Leonard David of Space.com that humans most “likely vector” for life on Moon

Credits: NASA, LinkedIn, LSSW, GSFC, JSC

Weekend Edition
Fri-Mon / 9-12 June 2023

National Moon Missions Around World Making Final Preparations for Launch / Lunar Surface Landing Attempts

ULA Vulcan Centaur on track to launch Astrobotic Peregrine NET July following nominal static-fire test of BE-4 methalox first stage engines, upper stage anomaly investigation ongoing, flight qualification 98% done; ISRO targeting 1-week launch window starting 12 July for Chandrayaan-3; Roscosmos set to launch Luna-25 on 11 Aug; JAXA SLIM to launch NET September, with video updates to be released as completed lander is transferred JAXA Space Exploration Center (Sagamihara Campus) to Tanegashima Space Center; Intuitive Machines making significant testing progress, on track for 2023 Nova-C launch

Credits: Intuitive Machines, JAXA

Thursday / 8 June 2023

Planetary Scientist to Delve into Expected Artemis 3 Moon South Pole Conditions

Lunar and Planetary Institute (LPI) Principal Scientist David Kring presenting What Might Artemis Astronauts Encounter at the Lunar South Pole?, an installment of LPI Cosmic Explorations Speaker Series, in hybrid online / in-person format today from Houston TX at 19:30 CDT; Low sun angle and jagged landscape may present unique challenges (visibility, traverse) and opportunities (PSRs, possibility of collecting 4.3 billion+ year old pre-Nectarian material) for 2-member Artemis 3 crew, now likely launching to MSP NET 2026 per NASA Exploration Systems Administrator Jim Free; Event will be live-streamed

Credits: LPI, NASA, KARI