Weekend Edition
Fri-Mon / 17-20 March 2023

China Plans for Lunar Station Science, India Advancing Chandrayaan-3 Landing, UK Developing Nuclear Reactor

Earth Observation, stellar formation and origin of Moon are science focus areas for ILRS per Zou Yongliao of CAS; Lunar agriculture and ISRU also to be prominent in upcoming phase 4 CLEP missions Chang’E 6-8 (NET 2024, 2026, 2028); ISRO on track for late June / early July launch of Chandrayaan-3 following successful vibration / acoustic and electromagnetic testing; UK Space Agency to provide an additional US$3.53M to Rolls-Royce-led micro-reactor project supported by Sheffield, Oxford, Brighton, Bangor universities with goal of deployment on Moon circa 2029

Credits: CNSA, CAS, ISRO, Rolls-Royce

Friday / 24 Feb 2023

India Chandrayaan-3 Major Modules and Rover Advance Toward June-July Launch, Pass Key Tests

 Aiming for ~110km east of Chandrayaan-2 attempted landing site, Chandrayaan-3 propulsion module, lander and 26-kg rover undergoing major evaluations at U R Rao Satellite Centre in Bengaluru for NET June launch to 70.83°S, 22.67°E; Passing Electro Magnetic Interference/ Electro Magnetic Compatibility (EMI-EMC) tests early February for radio-frequency communication links between modules allows further subsystems & payload checks to continue; Mission will use Indian Deep Space Network for Earth comms and has agreements with NASA Deep Space Network & Estrack network as backups

Credits: ISRO, TAVD / URSC

Tuesday / 14 Feb 2023

ISRO Preparing Host of Advanced Science Payloads for Chandrayaan-3 Lander, Rover and Propulsion Modules

Launching NET June, Chandrayaan-3 is targeting a 4 x 2.4-km site between Manzinus N and Manzinus U craters (69.37°S, 32.35°E), ~109km east of planned landing site of Chandrayaan-2 (2019); 1,726-kg lander will carry 7 science instruments including Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA) and 9 sensors; 26-kg rover outfitted with Laser Induced Breakdown Spectroscope (LIBS) and Alpha Particle X-ray Spectrometer (APXS); 2,148-kg Propulsion Module will host Spectro-polarimetry of HAbitable Planet Earth (SHAPE) at 100-km polar orbit; Surface operations to be conducted over 1-lunar day / ~14 Earth days

Credits: ISRO, CNSA, NASA

Weekend Edition
Fri-Mon / 10-13 Feb 2023

Independent / Commercial and National Moon Missions Working to Join Chang’E-3 & 4 Operating on Lunar Surface

ispace striving to conduct 1st commercial activity on Moon with landing of Hakuto-R, collection of regolith under US$5,000 NASA contract; ispace Lead Spaceflight Operations Engineer Angel Milagro updates on M1 progress (now 1,200,000 km from Earth), on track for April landing; JAXA SLIM launching NET April to Shioli crater; Ars Technica forecasts Astrobotic launch to Gruithuisen Domes NET May; ISRO Chandrayaan-3 targeting plain between Manzinus N and U craters NET June; Intuitive Machines launching to MSP on SpaceX F9 NET late June; Roscosmos Luna-25 may launch to Boguslawsky crater NET July

Credits: ispace, JAXA, IM, Astrobotic, LinkedIn

New Year Holiday Edition
Fri-Mon / 23 Dec 2022 – 2 Jan 2023

2023 Moon Roster Full of Independent and National Touchdowns Following 2022 Orbital Activity

At least 6 attempts to robotically land on the lunar surface are slated for 2023, after a year that saw Capstone DRHO insertion, Danuri near 100 x 100 km desired polar orbit (refining current 109 x 8920 km via 4 additional orbital maneuvers), Artemis 1 flyby / DRO; Hakuto launched on Dec 11 as Orion splashed down, now on 1-month cruise to next TCM targeting April landing; Landers Nova-C and Peregrine launching NET Q1, SLIM April, Chandrayaan-3 June, Luna-25 July, while Chang’E-3 lander / LUT, Chang’E-4 Yutu-2 rover continue only current operations on Moon

Credits: NASA, ispace, IM, Astrobotic, ISRO

Weekend Edition
Fri-Mon / 2-5 Dec 2022

Wave of Independent Moon Missions to Trail Artemis 1, Followed by National Efforts, Then Another Raft of Indies

As NASA / ESA Orion Moonship returns to Earth, Advanced Space-controlled, Tyvak-built, NASA-funded Capstone remains in NRHO and Korea Pathfinder Lunar Orbiter Danuri on course to reach Moon orbit 16 Dec, planned commercial missions include ispace M1 awaiting SpaceX launch at KSC pending F9 review; Intuitive Machines IM-1 March 2023; Astrobotic PM1 Q1 2023; Followed by national missions from JAXA (SLIM, April 2023), ISRO (Chandrayaan-3, June 2023), Roscosmos (Luna-25, July 2023); Independents IM-2 (late 2023), SpaceX landing demo mission (2024), IM-3 (Q2 2024), Astrobotic GM1 (Nov 2024)

 Credits: NASA, ISRO, KARI, IM, SpaceX, Astrobotic,

Weekend Edition
Fri-Mon / 14-17 Oct 2022

2023 Lunar Missions on the Horizon as Artemis 1 Flyby and M1 Lander Preparing for Launches

NASA and ispace poised for 2022 Moon flyby / robotic landing, while several missions now targeting 2023; Astrobotic, Intuitive Machines, ISRO, JAXA to launch Peregrine, Nova-C and Chandrayaan-3, SLIM landers NET Q1; Roscosmos plans Luna-25 launch via Soyuz-2.1b NET Q3; Also within 2023 Intuitive Machines striving to launch IM-2 mission including first satellite of lunar data relay ‘Khonstellation’, μNova hopper, SHERPA-ES tug, Orbit Fab Tanker-002 in-space fuel depot; Rocket Factory Augsburg to begin deployment of Harmony cislunar constellation; SpaceX to take Yusaku Maezawa and 8 selected crew, 1-2 professional astronauts on dearMoon lunar flyby with Starship

Credits: ISRO, SpaceX, RFA, dearMoon

Weekend Edition
Fri-Mon / 23-26 Sep 2022

International Assortment of Robotic Landers Preparing for Launch to Lunar Surface

ispace Hakuto-R reportedly set to launch on SpaceX F9 during 9–15 Nov window, carrying UAE Rashid 1 rover to Moon on 3-month low-energy trajectory; Astrobotic holding to Q4 Peregrine launch amid USSF statement that BE-4 successfully demonstrated full engine performance, raising hopes for timely integration with ULA Vulcan Centaur launch vehicle; Intuitive Machines aiming for Q1 2023 Nova-C launch via SpaceX F9; ISRO Chandrayaan-3 to launch on GSLV NET Feb 2023; JAXA SLIM targeting March 2023 for launch on H-IIA

Credits: JAXA, IM, Astrobotic, ISRO, ispace

Weekend Edition
Fri-Mon / 12-15 Aug 2022

Commercial and National Moon Mission Cadence to Continue Through 2022, Increase in 2023

Artemis 1 launching to Moon orbit NET 29 Aug with 10 rideshare cubesats, NASA test dummy Commander Moonikin Campos, DLR / ISA torso radiation ‘phantoms’ Helga & Zohar, mascots Snoopy & Shaun the Sheep; Race to landings led by ispace, aiming for Nov launch, Astrobotic working to launch NET Dec, seeking to acquire Masten assets with US$4.5M bid; Intuitive Machines striving for Jan 2023 followed by ISRO Chandrayaan-3 NET Q1, JAXA SLIM NET March and Roscosmos Luna-25 NET September; Xplore of Redmond WA and Turkish Space Agency have also declared for uncrewed lunar orbit in 2023, SpaceX plans crewed dearMoon

Credits: Lockheed Martin, NASA, ispace, ESA

Friday / 1 July 2022

China and India Working on Spacecraft Technology for Crewed and Automated Moon Exploration

China Aerospace Science and Technology Corporation (CASC) prototyping new hydrolox rocket engine for lunar version of ‘New-Generation Manned Launch Vehicle’ / Long March 5DY, with component check, fault detection and ignition tests achieved; Indian Space Research Organisation (ISRO) advancing Chandrayaan-3 redesign, improving lander legs, sensors and propulsion system, with ongoing testing at ISRO Propulsion Complex in Mahendragiri; China aiming for human Moon landings within 2020’s decade, India 2nd robotic landing attempt likely to occur NET 2023

Credits: CNSA, ISRO