Tuesday / 10 Jan 2022

Radio Astronomy from the Moon Initiatives Progressing via NASA NIAC, Preliminary Missions Scheduled Through 2025

CLPS Science 3 delivery to Moon farside to be 9th in program NET 2025 by TBD lander provider; CS-3 payload LuSEE-Night to observe radio frequencies <50MHz, 21-cm big bang signals via spectroscopy; Also launching NET 2025 is CLPS PRISM-12 with LuSEE-Lite precursor on Draper Series 2 lander; IM-1 mission to carry Radio-wave Observations at the Lunar Surface of the photoElectron Sheath (ROLSES) NET March; Mega structure radio observatory concept LCRT receiving support via NIAC, FARSIDE may partner with Blue Origin, Farview working with Lunar Resources; Open Lunar study with SGAC suggests ‘single international radio observatory’ be planned to preserve lunar radio-quiet

Pictured: FARSIDE PI Jack Burns, ROLSES PI Natchimuthuk Gopalswamy, LCRT PI Saptarshi Bandyopadhyay, LuSEE PI Stuart Bale; Credits: NASA, UC Boulder, UC Berkeley, Vladimir Vustyanky / JPL

Weekend Edition
Fri-Mon / 6-9 Jan 2022

A Host of Robotic Moon Landings in 2023 to Precede New Era of Human Lunar Orbital Missions

Artemis Age of lunar exploration will continue full-steam in coming year with NASA CLPS lander missions from Intuitive Machines (IM-1) and Astrobotic (PM1) targeting Q1 launch followed by JAXA SLIM NET April, ISRO Chandrayaan-3 NET June, Roscosomos Luna-25 NET July; SpaceX aims to send 9 passengers on lunar flyby on Starship dearMoon by EOY; NASA working towards Artemis-2 mission launching NET May 2024 with 4-member crew (3 USA, 1 Canada) to be announced soon; Meanwhile ispace Hakuto-R expected to join 9 international orbiters NET April; 4 Artemis-1 CubeSats in vicinity

Credits: NASA, JAXA, Lockheed Martin, Tyvak

Weekend Edition
Fri-Mon / 9-12 Dec 2022

Orion Return is Beginning of New Era of Lunar Exploration as 2023 Commercial and National Moon Mission Prepare

Mission team including Landing / Recovery Director Melissa Jones, Entry Flight Director Judd Frieling now planning to recover Orion capsule near Guadalupe Island, ~241 km from Baja California coast following 11 Dec 09:40 PST splashdown; Just 10 hours prior, ispace HAKUTO-R lander is to launch to Moon from CCSFS (02:38 EST); CLPS missions from Intuitive Machines and Astrobotic to follow NET Q1 2023, JAXA SLIM NET April, ISRO Chandrayaan-3 NET June; Artemis 2 circumlunar crewed mission NET May 2024, SpaceX uncrewed demo mission and crewed dearMoon NET 2024

Credits: Astrobotic, Blue Origin, NASA

Friday / 2 Dec 2022

Artemis 1 Orion Spacecraft Departing Lunar Distant Retrograde Orbit for Moon Flyby, Earth Return and Reentry

Orion headed back toward Moon following 105-second main engine trajectory maneuver, a 4-day leg of Artemis 1 journey which has seen the furthest travel of any human-rated vessel (aside from Apollo 10 ascent module in heliocentric disposal orbit) at 432,210-km from Earth; Final powered lunar flyby set to occur at 8:43 PST on 5 Dec, sending Orion on a 6-day trip towards Earth; 11 Dec reentry at 9:40 to be fastest (39,429 kph / Mach 32) and hottest (2,760°C) to date, first to employ ‘skip’ technique allowing precision splashdown and lowered g-forces

 Credits: NASA

Tuesday / 15 Nov 2022

NASA Moon Flagship Artemis 1 Ready for Inaugural Launch to Lunar Orbit and Secondary Payload Deep Space Delivery

Weather forecast estimated at 90% favorable for 2-hour window set to begin on 16 Nov 01:04 EST for launch of Artemis 1 mission from historic KSC Launch Pad 39B; Live broadcast to begin with SLS core stage fueling with Launch Control Center commentary at 15:30 on 15 Nov followed by launch coverage starting at 10:30, continuing through SRB (~T+2 minutes), core stage (T+8 minutes) and upper (Interim Cryogenic Propulsion) stage separation and TLI; Post-launch news conference with mission team scheduled for 04:00 16 Nov

Pictured: (Clockwise) NASA Administrator Bill Nelson, Artemis Mission Manager Michael Sarafin, JSC Flight Director Emily Nelson, Orion Program Manager Howard Hu, SLS Program Manager John Honeycutt, Exploration Ground Systems Program Manager Mike Bolger; Credits: NASA, LinkedIn, ULA

Friday / 11 Nov 2022

Japan Authorizes ispace to Prospect on Moon During HAKUTO-R Mission 1 Launching NET Nov 22

First license under Japan Space Resources Act now held by ispace, which is set to lead wave of commercial Moon landing activity with M1, currently awaiting launch opportunity via SpaceX F9 at KSC SLC-40 to ~3-month low energy transfer, landing at Lacus Somniorum (37.56° N, 30.8° E) on Moon; ispace plans to collect and sell lunar regolith ‘in place’ to NASA during M1 under US$5,000 contract; CEO Takeshi Hakamada says “Space resource utilization is another step toward our goal of establishing the cislunar economy” in release

Pictured: ispace CEO Takeshi Hakamada, Japan Minister of State for Space Policy Sanae Takaichi; Credits: ispace, Twitter, PM Office of Japan

Weekend Edition
Fri-Mon / 28-31 Oct 2022

NASA Economic Impact Study Shows US$71.2B Effect on Output, NASA OTPS Issues Lunar Exploration Policy Recommendations

While NASA itself employs some 19,000+ civil servants, its operations support an estimated 339,600 jobs nationally, per Economic Impact Report generated by IMPLAN modeling software, compiled by researchers at Voorhees Center in Chicago; Study estimates 1,000,000+ people in 90 nations employed in $469B global space industry; Lunar Landing and Operations Policy Analysis issued by Office of Technology, Policy, and Strategy identifies 7 lunar challenges / mitigation approaches: Landings, Surface Operations, Surface Movement, Radio-Frequency Interference, Areas with Special Characteristics, Unexpected Activities and Human Heritage Protection

 

Pictured: (TL-TR) Amanda Hernandez, Gabriel Swiney (NASA OTPS), (BL-BR) Yittayih Zelalem, Joshua Drucker, Zafer Sonmez (Voorhees Center); Credits: NASA, NSS, LinkedIn

Tuesday / 25 Oct 2022

Artemis Moon Return Advances with Analog Training, 3 Orion Capsules on Order as Cost Transparency Urged

NASA analyzing data gathered by NASA / JAXA Astronauts Drew Feustel, Zena Cardman, Jessica Meir, Stan Love, Akihiko Hoshide, Norishige Kanai during nighttime Moonwalk simulation (JETT field test #3) and 3-day pressurized rover sojourn (D-RATS) near Flagstaff AZ; Lockheed Martin to build Orion additional crew capsules for Artemis missions 6-8 at cost of US$1.99B; Wayne Hale of NASA Advisory Council recommends PPP contract details be public, expresses concern on program architecture and 1-way Starship landing test; Former NASA Administrator Jim Bridenstine joining Advisory Board of CLPS provider Firefly

Credits: Lockheed Martin, NASA

Weekend Edition
Fri-Mon / 21-24 Oct 2022

Multiple International Lunar Missions Prepare to Launch as CAPSTONE and Danuri Near Lunar Orbit

NASA CAPSTONE mission team preparing to execute TCM-4 with possibility of ongoing thruster malfunction, spacecraft to enter lunar halo orbit NET 13 Nov; KARI Danuri following on similar low-energy route, to achieve lunar orbital (100km) insertion NET 17 Dec; Uncrewed Artemis 1 launch window to lunar flyby opens for 69 minutes at 00:07 EST on 14 Nov from KSC, where ispace is also aiming for M1 lander launch 9-15 Nov and NASA is prepping Orion heat shield for use in Artemis 3; Astrobotic Peregrine, Intuitive Machines Nova-C NET Q1 2023; Roscosmos Luna-25 NET July 2023; ISRO now targeting NET June 2023 launch of Chandrayaan-3 Moon lander / rover

Credits: NASA, Advanced Space, IM, Astrobotic, KARI, ISRO, Lockheed Martin

Friday / 30 Sep 2022

Japan Spacecraft at Forefront of Lunar Return with ispace Lander, Cubesat Rideshares on Artemis 1

ispace HAKUTO-R mission reportedly targeting 9-15 November launch to Lacus Somniorum (Lake of Dreams) via SpaceX Falcon 9; ispace lander to deliver Rashid rover and collect regolith for sale to NASA under precedent-setting US$5,000 contract in accordance with Outer Space Treaty 1967; JAXA 6U CubeSats OMOTENASHI (Hospitality) and EQUULEUS to deploy from Artemis 1 Orion Stage Adapter, perform critical trajectory maneuvers to pathfind Earth-Moon L2 libration orbit and achieve semi-hard (~30 m/s) landing; OMOTENASHI retrorocket / airbag surface delivery system may serve as low-cost model for future Moon surface payloads

Pictured: (L-R) ispace CFO Jumpei Nozaki, ispace CEO Takeshi Hakamada, NASA Deputy Associate Administrator for Business Operations Casey Swails, ispace EU Director Julien-Alexandre Lamamy; Credits: NASA, JAXA, ispace