Capstone Team Working “Around the Clock” to Restore Spacecraft to Nominal Operational State
Advanced Space, Terran Orbital, and NASA focused on correcting anomalous behavior of ~US$30M Capstone, currently deemed stable, on trajectory to achieve lunar Near Rectilinear Halo Orbit and in communication with Deep Space Network, however still tumbling in safe mode after losing attitude control and comms in event associated with 8 Sep Trajectory Correction Maneuver 3; Sufficient solar power being generated to heat 8-thruster hydrazine propulsion system built by Stellar Exploration; Recovery operation may be possible, utilizing thrusters if 5° C thermal stability is achieved for 12 hours